top of page

INDUSTRIAL

EXPANSION OF MANUFACTURING AND ASSEMBLY
OF MINING EQUIPMENT

CLIENT

Russell Mineral Equipment (RME)

LOCATION

Hursley Road

Glenvale QLD

YEAR

2019

PROJECT CATEGORY

INDUSTRIAL

Medium Impact Industrial Development
PROJECT OUTLINE
 

Precinct Urban Planning was engaged by Russell Mineral Equipment (RME) to provide town planning assistance associated with expanding their medium impact industry operations for the manufacture and assembly of mining equipment. RME was required to apply for a Material Change of Use (MCU) to expand their operations and this also involved Precinct coordinating specialist assessments for noise and stormwater management.


The project involved 2 stages:

  • Stage 1 – Construction of a new Assembly Building for assembling pre-manufactured and pre- pained metal parts into mining equipment.

  • Stage 2 – Construction of a new Fabrication Building for cutting and welding of raw metal products to be manufactured into metal parts.


KEY TASKS
 
  • Provision of Strategic and Statutory Planning Advice

  • Development Application Preparation

  • DA Process Management

  • Development Facilitation


bottom of page